Even though we had planned the build with minimal site disturbance and changing of levels in mind (the house was designed to match the contour of the block, with 2 levels separated by a couple of steps in order to meet the upward slope as you progress down the block) there still seems to be much work in preparing the site and getting the right levels. Kangarilla Earthworks invited mum and dad on site and let them know that they removed some soil and brought in dolomite.

They even have a site office sign now. Cute.

2 big trucks in the street - one for carrying the bobcat, one for carrying away the soil.

2 big trucks in the street – one for carrying the bobcat, one for carrying away the soil.

Did they close the street or was it for something else?

Did they close the street or was it for something else?

Machines at work

Machines at work

P1090903 (Large)

Port-a-loo!

Port-a-loo!

Site Office sign on the fence in front of the carport.

Site Office sign on the fence in front of the carport.

Steep level up (where the steps will be?)

Steep level up (where the steps will be?)

Cutting down in from the fence (to make way for the slab?)

Cutting down in from the fence (to make way for the slab?)

Water meter being used. Glad we put the box in to protect it a bit.

Water meter being used. Glad we put the box in to protect it a bit.

 

Advertisements

Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s