Week 5 Pouring the slab

10 02 2015

The contractors worked hard to get all the mesh down for the reinforcement of the slab – including working on Saturday morning to get it all done before the concrete mixers came on Monday. At least 2 concrete mixers turned up to site and the bottom half of the house slab was poured. The upper level of the house at the back of the block is getting poured in a second stage.

Concrete mixer in the driveway.

Concrete mixer in the driveway.

Slab poured up to the split in floor levels. You can see the second bathroom plumbing on the upper level.

Slab poured up to the split in floor levels. You can see the second bathroom plumbing on the upper level.

Slab poured. Plastic covering the LDK section - is that because it's going to be polished concrete floor?

Slab poured. Plastic covering the LDK section – is that because it’s going to be polished concrete floor?

SLAB!

SLAB!

 

Advertisements

Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s