Week 5 Slab Formwork

12 02 2015

Monday the lower level slab was poured. Then the next day formwork was put in for the upper level slab. The upper slab was poured on Friday.

Formwork for the upper level slab going in.

Formwork for the upper level slab going in.

Lower slab covered in plastic sheeting.

Lower slab covered in plastic sheeting.

Slab poured on the upper level.

Slab poured on the upper level.