Wall raising weekend continued

5 04 2015
alternating cut and folded sides of the bale with each course

alternating cut and folded sides of the bale with each course

compressing the bales using the tension tool to pull down on the strapping

compressing the bales using the tension tool to pull down on the strapping

looking down the south wall of the house, facing east

looking down the south wall of the house, facing east

attaching moisture barrier plastic to any exposed bits of concrete so the bales don't absorb moisture from it.

attaching moisture barrier plastic to any exposed bits of concrete so the bales don’t absorb moisture from it.

Looking down the south internal living room wall

Looking down the south internal living room wall

Cutting and stapling mesh - a time consuming part of the prep work

Cutting and stapling mesh – a time consuming part of the prep work

Horizontal strapping around wall sections so timber framework does not bow out

Horizontal strapping around wall sections so timber framework does not bow out

Advertisements

Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s