Painting

22 06 2015

On Friday the concrete floor got cut and polished. But we couldn’t walk on it yet as it needs 48 hours to sit.

We spent Saturday painting the external pergola timbers so the LVLs are no longer yellow but Ironstone.

P1110434 (Large) P1110447 (Large) P1110450 (Large) P1110451 (Large) P1110464 (Large) P1110471 (Large) P1110474 (Large)

Advertisements




Final coat render

14 06 2015

Third and final coat render on the inside took place in about 2 days, after about 3 days of plastering to patch in the windows and complete the square shapes around windows and tops of walls.

Bathroom tiling also took place around the renderers.

Next week is going to be a busy week.

 

Tiling on the floor in the second bathroom/powder room

Tiling on the floor in the second bathroom/powder room

See the colour difference between the second coat (closest wall section) and third coat

See the colour difference between the second coat (closest wall section) and third coat

Living room in transition

Living room in transition

Applying the render by hand

Applying the render by hand

The boys hard at work putting on the final coat render

The boys hard at work putting on the final coat render

Tiling on the shower walls in the first bathroom

Tiling on the shower walls in the first bathroom

Bedroom final coat render

Bedroom final coat render

Bedroom one final coat render around the window reveal

Bedroom one final coat render around the window reveal





Tiling the bathrooms

10 06 2015

I think all the tiling in the bathrooms will be done in 3 days.

The floor in the second bathroom has been done, with the first bathroom floor being done today now that I’ve confirmed the tile pattern/arrangement.

Grout colours have also been selected. Ultra white on the wall, Charred ash on the floor and Slate grey on the subway splashback on the kitchen.

20150610_114947





Pre-third coat rendering

8 06 2015

The front door is in, as is the kitchen door with the 180 degree hinges.

The shoebox/entry portico is pretty much done, with the Danpalon window panel to one side of the door.

The bathrooms have been prepped for tiling with a blue waterproof base.

Richard and Scott have spent a few days patching in the windows and completing the window and wall shapes before third coat render goes on.

External cladding complete

External cladding complete

Lots of light in the shoebox

Lots of light in the shoebox

Square shapes being formed pre-third coat render

Square shapes being formed pre-third coat render

Bath 2

Bath 2

Top of wall render shape

Top of wall render shape

Tops of walls and windows being shaped

Tops of walls and windows being shaped

Bath 1 prepped for tiles

Bath 1 prepped for tiles

Shoebox entry

Shoebox entry