Protected: Stalin’s youngest daughter

28 07 2015

This content is password protected. To view it please enter your password below:





One week until handover

28 07 2015

There have been a flurry of trades at the house over the past week; completing the tiling, plumbing fixtures, installing the hot water service, putting down the floors and skirtings… The week leading up to handover has been quiet though – no one around apart from professional cleaners booked in for the day before handover. Our co-project manager did spend an hour walking through the site making a list of all the little things they needed to address like door stops, siliconing gaps between floorings.

Completed kitchen, with tiled splashback

Completed kitchen, with tiled splashback

Mirror and frameless shower screen in bath 1.

Mirror and frameless shower screen in bath 1.

Frameless shower screen in.

Frameless shower screen in.

Bath/laundry complete with mirror.

Bath/laundry complete with mirror.

Hallway with bamboo floor

Hallway with bamboo floor

Island bench

Island bench





Protected: Kids

14 07 2015

This content is password protected. To view it please enter your password below:





3 weeks til handover

12 07 2015
20150709_102002

External painting of eaves and barges being completed.

Kitchen cupboards going in ... an hour's work putting all those up

Kitchen cupboards going in … an hour’s work putting all those up

Laundry cupboards being installed

Laundry cupboards being installed





Fixing it up

4 07 2015

We finished putting three coats of Ironstone coloured paint on the pergola beams. Internal doors are in, along with door hardware. The vanity is wall hung and most of the skirtings are in.

Pendant light over kitchen island

Pendant light over kitchen island

Wall hung vanity in main bathroom

Wall hung vanity in main bathroom

Polished concrete floor

Polished concrete floor. Very shiny. 

Internal door and handle (unpainted)

Internal door and handle (unpainted)

All pergola beams and downpipes painted.

All pergola beams and downpipes painted.