Month: March 2015
-
Week 11 Roof and handover
It’s busy on site – we had a site meeting early in the week to go through the electrical plan and talk through the straw bale wall raising and rendering and how that will fit around the rest of the site works. Internal frames were still going up, including bracing plywood, and then the sissilation…
-
Protected: Big brother
There is no excerpt because this is a protected post.
-
Week 9 LVLs in place
The highly structural LVL (laminated veneer lumber) painted in the gorgeous bright yellow got put up. The roof looks quite high now! The ceiling will be attached to the underside of the LVL beams, so will follow the slope of the roof – no ceiling will be horizontal*! The beams run all the way out…
-
Week 8 Frame it
On Tuesday the steel was delivered and it started to go up so the long thin roof has something to hold it in place! By Wednesday it looked like most of the steel was up and a big truck with a crane was offloading timber. Friday the electricity meter is being installed and connected so…