Month: February 2015
-
Week 5 Slab Formwork
Monday the lower level slab was poured. Then the next day formwork was put in for the upper level slab. The upper slab was poured on Friday.
-
Week 5 Pouring the slab
The contractors worked hard to get all the mesh down for the reinforcement of the slab – including working on Saturday morning to get it all done before the concrete mixers came on Monday. At least 2 concrete mixers turned up to site and the bottom half of the house slab was poured. The upper…